NGT Pear Lead with Swivel 1,125oz/32g Fishing with swirl - base lead, long throw lead
The unique pear shape makes the Pear Lead a good long throw lead that highlights its advantages in soft water bottom.
Austria from 90€ / Germany from 160€
Lieferzeit ca. 1-3 Werktage ab Zahlungseingang
Delivery within 1-3 working days
14 Tage Geld-Zurück-Garantie
Secure and trusted checkout
Sichere und vertrauenswürdige Kaufabwicklung
Pear Lead with swivel - base lead
Weight: 1.125oz/32g Color: Green, with swirl
Lead is particularly important utensils for bottom fishing that you should not underestimate.
With this lead in pear form from the house NGT you have the advantage that this lead sinks particularly well into the soft water bottom and is therefore well camouflaged.
Another absolute plus point with this lead is the pear shape, because the lead makes it an aerodynamic all-rounder, which also increases your throwing distance.
Features:
Color: green
Weight: 1,125oz / 32g
aerodynamic design
with swivel