NGT Tri Bomb Lead Set 10x 1.5oz/43g Fishing lead with swivel – base lead, long throw lead
With this set you are optimally equipped for your next sessions, because the unique sharpened shape makes the Tri Bomb Lead a long throw lead par excellence.
Lieferzeit ca. 1-3 Werktage ab Zahlungseingang
Lieferzeit ca. 1-3 Werktage ab Zahlungseingang
14 Tage Geld-Zurück-Garantie
14 Tage Geld-Zurück-Garantie
Secure and trusted checkout
Sichere und vertrauenswürdige Kaufabwicklung
Tri Bomb Lead Set 10x 1.5oz/43g Fishing Lead with Swivel – Base Lead Long Throw Lead
Composed of:
10x NGT Tri Bomb Lead with Swivel 1,5oz/43g
Tri Bomb Lead with Swivel
Weight: 1.5oz / 43g Color: Green, with swirl
Lead is particularly important utensils for bottom fishing that you should not underestimate.
With this lead from the house of NGT, which has a slightly sharpened underside but still reminds of a pear shape, you have enormous aerodynamic advantages.
An absolute plus point with this lead is the pear shape, because the round design with sharpened underside makes it aerodynamically an absolute dream, a long-throw lead as every fisherman wishes.
Features:
0
Content: 10 pieces
Color: green
Weight: 1.5oz / 43g
best aerodynamics
with swivel